logo

Pine Shore Energy

Plug-in Facts:

Pineshore products and services are now available thru NC contract 691A: Electric Vehicle Charging Station Equipment, Accessories, Installation & Infrastructure (https://ncadmin.nc.gov/691a) – this is for ABB, BTCPower, ClipperCreek and Tesla. We are setting up an “EV Hosting Facility” in Winston Salem (131 Fayette Street) for development, demonstrations and trainings. Our vision is along the lines of the EV showcase (https://forthmobility.org/showcase) only a little more ‘real-time’ and outdoor oriented.

Website